Equipment Types In the process of printed circuit board production, there are mainly two types of electroplating equipment used: one is the horizontal electroplating line, and the other is the vertical electroplating line. The main difference between these two electroplating equipments with different structures is the transport method of the circuit boards, and the structure of the conveyor board equipment used is also different, therefore the maintenance is also slightly different.


Daily Maintenance and Care Methods


1. Maintenance and Care of the Tank Body The main difference between the vertical electroplating line and the horizontal electroplating line lies in the different transport methods of the circuit boards, but the maintenance and care methods for the tank body are essentially not much different. Every 7d, perform a cleaning of each washing tank; perform a cleaning of the acid cleaning tank and replace its tank solution; perform an inspection of the spray device inside the tank body to check for any blockage, and promptly clear any blockages that occur; perform a cleaning of the conductive supports, anodes, and the contact points with the live wire on the copper plating tank and tin plating tank; during cleaning, a cloth can be used for wiping and sandpaper for polishing; perform an inspection of the titanium baskets and tin bar baskets of the copper plating tank and tin plating tank, replace worn-out titanium basket bags and tin bar baskets, and add copper balls and tin bars; after adding the copper balls and tin bars every 7d, the copper electroplating tank and tin electroplating tank must be electrolyzed.


Every 7d, also use high and low current methods for trial production, and only proceed with production after the performance of the newly added copper balls and tin bars has stabilized. Every 90, perform a cleaning of the copper balls and anode bags. Every 120~150d, use activated carbon to filter and clean the tank solution once to filter out impurities from the tank solution, and perform a cleaning of the tin tank.


2. Maintenance and Care of the Vibration Mechanism of the Vertical Electroplating Line In vertical electroplating, to ensure the uniformity of the copper surface and the effect of the through-hole copper during electroplating, the boards will be vibrated and rocked, and there will be a vibration and rocking mechanism on the tank body.


Every 30d, inspect the reducer to see if it operates normally, and check its fastening; check the fastening of the vibration installation motor bolts; check the wear condition of the vibration rubber, and promptly replace it if the wear is relatively severe.


Every 180d, inspect the contact condition of the power supply lines inside the junction box, promptly tighten any loose connections, and promptly replace power supply lines with melted or aged insulation layers to ensure the insulation between the power supply lines; inspect all bearings on the vibration mechanism, apply grease, and promptly replace severely worn bearings.


Maintenance and Care of the Circuit Board


3. Maintenance and Care of the Overhead Crane of the Vertical Electroplating Line The vertical electroplating line uses an overhead crane and hangers to transport the circuit boards. Every week, perform a cleaning of the crane and hangers (the crane and hangers do not need to be disassembled), keeping their appearance clean and tidy; during cleaning, a cloth can be used for wiping and sandpaper for polishing. Every 30d, inspect the hangers to check for damage; inspect and maintain the motor and reducer of the crane, check its entire transmission device, and ensure its normal operation. Every 180d, perform an in-depth cleaning and maintenance of the crane and hangers, and disassemble the hangers from the crane for cleaning.


4. Maintenance and Care of the Conveyor Device of the Horizontal Electroplating Line The conveyor device used in the horizontal electroplating line is a roller, which utilizes the rotation of the roller to continuously feed the circuit boards into each tank, therefore, the maintenance of the conveyor device of the horizontal electroplating line is somewhat different from that of the vertical electroplating line. Every 7d, perform a cleaning of the rollers of the horizontal electroplating line to clean off foreign matter adhering to the rollers, ensuring the cleanliness of the board surface during transport; inspect the interconnector to check for any loosening. Every 180d, inspect the rollers to check for wear, and promptly replace worn rollers to ensure that no board jamming occurs during transport; inspect the transmission gears, transmission shafts, and the entire transmission system device, and promptly repair any problems that occur.


5. Maintenance and Care of the Circulation Filtration System Every 7d, inspect the filter cartridge of the circulation filtration system to check for any leakage. Every 10~15d, clean or replace the filter cotton core. Every 30d, replace the filter carbon core to ensure the filtration quality and the flow rate of the filter; clean the filtration pump, as well as the filtration air cover and filtration mesh of the air pump. Every 30d, inspect the contact condition of the pump motor power supply line connector, promptly tighten any loose connections, and replace aged wires with new ones to ensure good contact and safe insulation, protecting the motor.


6. Maintenance and Care of Other Parts Every 7d, perform two inspections of the output power of the power supply; inspect the cooling fans and heat sinks of the power supply and electrical control, remove dust and clean them to prevent them from affecting heat dissipation. Every 30d, inspect the electrical components of the electrical unit, and promptly replace them if there is any damage or corrosion; inspect all connectors, and promptly repair any poor contact, loose connection, or cold solder joint phenomena, and promptly replace them if there is any rust or damage; inspect each contactor and relay, and promptly replace them if there is poor contact or stuck contacts; inspect the main parameters of components such as capacitors, reactors, and resistors, and replace them as soon as possible if any abnormality occurs.


For the automatic feeding system, inspect and calibrate it once every 7d. Every 7d, clean the scale and dirt on the electric heater to prevent the internal temperature of the electric heater from becoming too high.


For each water and gas pipeline system, inspect it once every 7d to check for any running or leaking of air or liquid, and promptly repair and replace any pipelines that exhibit running or leaking of air or liquid.


II. Maintenance Discussion Before Long-term Shutdown If the equipment is planned to be shut down for a long time, it must be maintained to prevent it from being corroded and aged during the shutdown process, which should be achieved by: cleaning the floor, wiping the water on the floor to keep it dry, and keeping the machine table, tank interior, crane, and hangers clean and dry; it is best to wrap all motors with fresh paper for protection; inject grease into all bearings to prevent rust; completely drain all chemicals from all pipelines; drain the chemicals in the filter machine's filter bucket; take out the filter machine's filter cartridge and clean it; all heaters in the tank must be cleaned, dirt removed, and kept dry.